Why dig Trenches when there are better solutions
Trenchless construction process involves usage of smart equipment, materials, consumables, and suitable working methodologies. The deployed equipment need to be capable, materials & consumables have to meet the site requirements, working methodology deployed must be capable to overcome the impediments & deliver the project successfully. Any shortcoming in these parameters could lead to partial or complete project failures. These recommendatory guidelines aim to provide the basic inputs for buried utility network development activities.
Recommendations Booklet Structure
1. Purpose of Buried Utility Network Development Through Trenchless
2. Project Constraints and Linked Requirements
3. Selecting Trenchless Construction Method
4. Method Specific Limitations
5. Possible Failures During Construction Process
6. Common Issues & Challenges and their Resolution
7. Troubleshooting during Trenchless Construction Process
8. Preparation of As-Built Drawings & Records
Note: Interested stakeholders may share their inputs on above Recommendations at recommendations@indstt.com